Repair and cleaning of the nuclear power plant model
-
Repair and cleaning of the nuclear power plant model
Repair, cleaning and restoration of a training model of a nuclear power plant at the Belarusian National Technical University.-
Scale: 1/80
-
Detailing: high
-
Size: 3000 х 2000 mm
-
Implementation period: 10 days
-
-
Repair, cleaning and restoration of a training model of a nuclear power plant.
The model is installed at the Belarusian National Technical University.
The size of the model is 3000 x 2000 mm.
Some parts were broken and lost, during the time of using the model in the university, some parts were broken and lost.
All surfaces were covered with a thick layer of dust, and the backlight stopped working.
The model was disassembled, cleaned and reassembled, some elements were repainted.
The grass covering and the backlighting were restored.
We are ready to repair and restore your models in the shortest possible time.
-
-