NORTH WATERFRONT 1-9 phase of construction
-
NORTH WATERFRONT 1-9 phase of construction
Huge model of the North Waterfront (1-9 phase of construction) in Minsk.
The model is installed in the new sales office in residential complex North Waterfront.-
Scale: 1/600
-
Detailing: high
-
Size: 4500 х 2600 mm
-
Implementation period: 3 months
-
-
Architectural model on a 1/600 scale represents the 1-9 phase of construction of the residential complex North Waterfront in Minsk.
The complex in the north of Minsk is being developed by a company led by a businessman from the UAE, Mr. Alabbar.
The model has an impressive size — 4500 х 2600 mm.
For transportation, the model can be divided into 3 equal parts. The pedestal can be divided into 8 parts.
An exclusive pedestal in the form of an elliptical bowl is made of MDF and fiberglass painted gray.
The buildings are made of plastic, PVC, polystyrene and plexiglass.
The complex remains under construction, so some buildings are made in gray color. These buildings will be replaced later.
The model has interior lighting of buildings and facade lighting, which can be controlled from a remote control.
Lighting towers and street lamps are also illuminated.
More than 4000 different handcrafted trees create a realistic atmosphere on the model.
A transparent protective glass with a height of 200 mm is installed along the edge of the stand.
-
-
